Building Work in the Library (Open3)

From today (Tuesday 17th) the ongoing electrical renovation which has been taking place in the library this summer shall begin to move upstairs to the Open3 section.

This will result in a significant reduction in the amount of study and working spaces on this level. Additionally, there will be no access to the Support Services desk-window. In order to pass on and collect Inter-Library Loans, serials and theses requests and such, you will need to do so through the Customer Services desk at the front.

Until Levels 1 and 2 are fully open, there are study spaces available over the Re-Sit period (23rd August to 7th September, 9AM to 6PM) in Lecture rooms J001 and J002 in the Edward Herbert Building.  PCS will also be available in the PC labs in the Bridgeman Centre and Chemical Engineering S006.

We anticipate that there is likely to be considerable noise and disruption during this process, and we apologise for an inconvenience this will cause.

We will keep you up to date with further developments as they occur.