The Holywell Pod will be powered down to install a new power switchover panel.
Configuration Manager has built in resilience in Haslegrave so the service will be available as normal but consider the service at risk during this time.
Further correspondence will be sent out as required.
Timescale:
Time – 14/12/17 – 08:00am-16:00pm